woocommerce
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sites/traceycartledge.co.uk/public_html/wp-includes/functions.php on line 6114Talented Year 5 pupils at Clarendon Primary School in Bolton have been working with me to design a colourful, contemporary steelwork barrier for their school.
The twenty-metre long safety barrier – fabricated by Luke Lister Engineers in Stockport – is a delightful and charming feature that enhances the school building and also serves as a permanent display of the children’s vibrant works of art. The accomplished blacksmiths at Luke Listers have faithfully reproduced in forged steel a stunning representation of local wildlife from the children’s original artworks, which includes native butterflies, bees, birds, mini-beasts, plants and small animals.
For more information, check out the behind the scenes page below!
2015
Clarendon Primary School, Bolton
Vincent Abbey